BOILER OPERATION AND INSTALLATION MANUAL VIADRUS G 300 Date of revision 8/2007 CALOR SRL Str. Progresului nr. 30-40, sect
4. Positioning and installation 4.1. Boiler standing in boiler room The boiler is designed for positioning in closed areas with aggressiveness deg
Tab. No. 4 Flammability degrees of building materials and products Flammability degree of building materials and products The building materials a
The connection must carried out only if approved by a chimney organization wand must meet all provisions of these standards. The chimney must be res
f) connection to the electricity network 230V/380V 50 Hz/TN-S g) connection to the chimney (the necessary chimney draught is 0,5 mbar). h) max.
„ The Operation and installation manual is a part of delivery in case that a equithermal regulation is required “. IMPORTANT WARNINGS : 1. The b
6. A careful closing of the burner plate with the burner , the sealing plate and all small covers – check their tightness. 7. Mount the holder wit
For size 11 – 14 sections For size 5 – 10 sections 16
1 – jacket front section 2 – front section 3 – central section 4 – rear section 5 – boiler insertion 6 – anchor bolt 7 – plug with external
Information for customer Packaging edentification PE Plastic sacks, folie, corrugaled board, iron and plastic fix line Assessment reference Identi
Table of contents: page
Dear customer we thank you that you decided to purchase VIADRUS G 300 boiler thus showing your confidence in company of ŽDB GROUP a.s., VIA
2. Boiler VIADRUS G 300 technical data Table No.1 Boiler thermo-technical parameters fuel efficiency : natural gas 33,99 MJ/kg furnace
3. Description 3.1. Boiler construction The boiler body (Fig. No.1) consists of sections assembled by means of forced-on insertions and is s
3.2. Electrical diagrams Conductor colour: GNYE green- yellow BK black RD dark red Legend: F1 fuse 6,3 A S1 Main switch H1 Boiler under voltag
K1 relay 24 VAC A1 Outside control X20 Burner connector X10 Burner connector NOTE: Water pressure manostat (PS1) only in design for MORA compan
running hours counter MPH1 Service hours gauge for 1st burner stage MPH2 Service hours gauge for 2nd burner stage F1 fuse 6,3 A BT3 Thermostat fo
Note 1) bypass pump controlled by a thermostat BOILER REGULATION master control boiler burner failure Boiler bypass pump boiler circulation pump RJ